Our To Do List

2

Check out our TO DO LIST! It’s entirely too long.

Things We are Working on Right Now:

Complete second floor renovation. View the latest here.

Kitchen Remodel. Check out our progress here.

Things We Need to Do:

Exterior/Yard:

  • New chimney cap and tuck-pointing chimney
  • Restore windows (strip paint, sand, reglaze, paint, fix broken sash cords)
  • Replace roof (half done)
  • New gutters
  • Replace siding as needed
  • Strip the spray paint from chimney (dumbass painters)
  • New driveway
  • Add a new garage
  • Clean up the gardens/landscape
  • Catio (a cat patio)
  • Build a Free Little Library

Back porch/deck

  • New footings
  • New decking and trim (cedar or pressure treated?)
  • Build pergola
  • Install new square tapered columns

Front porch

  • Paint
  • Build a hanging bed/bench/hammock
  • New light fixtures
  • New house numbers

Kitchen

  • Gut job–major overhaul.  Take a look here.

Living Room

  • Paint
  • Weatherize fireplace  done!
  • Window treatments

Dining Room

  • Strip wallpaper and install new craftsman style wallpaper
  • Install new push button light switch
  • Rewire light fixture
  • Window treatments

Main Floor Bath

  • Strip wallpaper, prime, and paint walls  done!
  • Install new toilet seat  done!
  • New pedestal sink  done!
  • New plumbing (replace drum trap under tub with a P-trap, new supply lines and drain to the sink)
  • New medicine cabinet  done!
  • New lighting fixtures  done!
  • Remove glass panel doors and replace with a shower curtain  done!
  • Patch tile floor and tile baseboard
  • Install exhaust fan done!
  • replace tub and surround

1st Bedroom Main Floor (Office)

  • Paint
  • Replace the ceiling
  • Overhaul closet: demo, insulate, new drywall, paint, install closet system

2nd Bedroom Main Floor (Guest Bedroom)

  • Paint
  • build new closet (frame, drywall, paint, closet system)

Hallway

  • Patch and Paint
  • install shelving in linen closet  done!

Dining Room Stairwell:

  • Add wainscoting and paint
  • Open up staircase to second level done!
  • add railing

Front Stairwell

  • Get rid of it and make it into closet space done!

Upstairs Current Living Room/Dining Room/Bedroom

  • Gut walls/ceiling done!
  • New electrical done!
  • Reconfigure doorways to make 3 bedrooms done!
  • Construct a walk-in closets  done!
  • Insulation done!
  • New drywall/paint done!
  • patch flooring done!
  • hang doors and trim
  • Remove old phone jacks  done!

Upper Level Bathroom/Kitchen

  • Gut job done!
  • new plumbing, electrical, insulation, walls done!
  • new laundry set-up done!
  • Install floors, tile, fixtures

Sleeping Porch

  • Gut, insulate, and install new walls
  • Paint
  • Replace old windows
  • Remove exterior staircase

Basement

  • Relocate the laundry upstairs done!
  • Create a separate Mancave, storage room, mechanicals room, and workshop
  • Overhaul ¾ bath
    • New vanity, toilet, urinal?
    • New lighting
    • New flooring
  • Insulate walls
  • Drywall
  • Remove dropped ceiling panels done!
  • New boiler/water heater combo unit
  • New electrical panel and small wiring fixes as needed

2 thoughts on “Our To Do List

  1. […] St. Paul Haus DIY in a Box About STP HausHaus TourTo Do List […]

Comment or I'll hate you forever.

Sarah&Adrian @ StPaulHaus

About Us

We are DIY weekend warriors. We like old houses and cats. Learn more here.

Follow STP Haus

Enter your email address to subscribe to this blog and receive notifications of new posts by email.

Join 47 other subscribers

InstaHaus

Kitchen Progress

craftsman kitchen remodel

2nd Floor Progress

second floor renovation

Posts by Room